Click on 'Bid Name', 'Status', or 'Deadline' in the header to sort by the corresponding field. Click on a specific Bid Name to see more detailed information about that Bid.

Bid Name  P  O  B  S* Status Deadline
Dock and Piling Work Open Order 2009 PLA does not apply OCIP not required Badging not required Safety required AWARD PENDING 12/30/2008
Pier 66 Elevator Modernization PLA does not apply OCIP not required Badging not required Safety required CANCELLED 12/09/2008
Seaport Asphalt Open Order 2009-01 PLA does not apply OCIP not required Badging not required Safety required ACTIVE 12/04/2008
Noise Remedy Sound Insul Prog 2008-07 PLA does not apply OCIP not required Badging not required Safety required AWARD PENDING 12/04/2008
UST Tank Removals Time and Material PLA applies OCIP not required Badging required Safety required ACTIVE 12/04/2008
Gate B-12 Loading Bridge Replacement PLA applies OCIP not required Badging required Safety required ACTIVE 12/03/2008
Mechanical HVAC Open Order 2008 PLA applies OCIP not required Badging required Safety required AWARD PENDING 12/01/2008
Doug Fox Retrofits NER Phase 1 PLA does not apply OCIP not required Badging not required Safety required ACTIVE 11/21/2008
Noise Remedy Sound Insul Prog 2008-06 PLA does not apply OCIP not required Badging not required Safety required AWARD PENDING 11/13/2008
T-46 Crane Repair Open Order 2008 PLA does not apply OCIP not required Badging not required Safety required CANCELLED 11/11/2008
* P = PLA, O = OCIP, B = Badging, S = Safety
 